Huatong services indonesia successfully performed 360 km2 3D seismic acquasition safely.

Huatong Services Indonesia has achieved a groundbreaking feat that sets it apart as the indisputable frontrunner in the Seismic Survey sector. With an unwavering focus on safety and data results, MGS has completed the 3D Seismic Acquisition survey in Offshore Bunyu, North Kalimantan, amidst the stringent stipulations of Pertamina Hulu Energi (PHE).

Our Industry

Delivering high-quality results is our passion. With punctuality, accurately, and reliability, Huatong Services Indonesia come with solution for our clients can depend on.

Established: Aug. 2023
Exclusive partnership with Hasta Karya Pelayaran Discover -2 Vessel Operator

PT HUATONG SERVICES INDONESIA

Talavera Office Park 28th Floor
Jl. TB Simatupang No.Kav. 22 – 26 Cilandak Barat
Kec. Cilandak Jakarta Selatan 12430

021-50323702

Our Parent - Huatong Company

Discoverer-2

Flag: Indonesia
Built / Upgrade: 1993 / 2023
LOA / Breadth: 70m / 18m
Gross tonnage: 2722
Max draft: 4.5m
Capacity 3D/2D: 4x 6km (7km) / 15km
Streamer: DigiSOLID
Recording system: DigiSOLID
Navigation system: ORCA by ION
Lateral steering: DigiFIN
Source system: Gunlink
QC / processing: Geovation

Our Footage

3D Marine North Ketapang
– 360km2
– 2 chase and 1 small supply boat
– Surrounded by 7,500+ rumpon
– As close as 1km from shore
Duration:
– Prime duration: 22 days!
– Infill: 6.4% thanks to steerable
streamer DigiFIN and favorable
current.
– Standby: 21 hrs. compensating the
change in survey plan.
– Tech. downtime: 9.2 hrs. on
compressor settings.

Our Footprints

3D North Ketapang

Project Information
Client: Petronas
Project name: 3D North Ketapang
Elnusa project no.: 2024-D2-M001
Survey type: 3D Marine
Volume: 360 sq.km
Survey orientation: E-W (90 deg.)
Water depths: 11 to 40m
No. of sail lines: 45
Sail line interval: 200m
No. of chase vessels: 2 + 1
Artanusa 01: MBES + SBES
BB99: Rumpon
Anugerah Laut 7: Small supply

Petronas 3D North Ketapang

Survey Execution

Petronas 3D North Ketapang

Commitment to HSE

Summary up to Demobilization (23 Oct 2024):
• Duration: 29 days
• POB: 84
• Safe Man Hours: 29,448
• No. safety cards: 170 / 133
• Near miss: 2

Recognition

Recent Brute Stack Test

Recent Brute Stack Test + AGC

Containerized Site Survey Geophysical Acquisition

You may need a survey for everything that is:
• Moved from one place to another (rig
movement)
• Laid on seabed (pipeline, cables)
• Has foundation in the seabed (platforms, wind
turbines, anchors, wellheads)
• Interacts with the seabed (drilling a well)
• Geohazards
Traditionally, a site survey vessel is required
where a single streamer, source and
instrumentation are installed as part of the unit.
Bring the vessel into the country can be costly
and must comply to the regulations, such as
cabotage law.
HSI offer a superior system flexibility where the
seismic streamer & auxiliary equipment, source
system, positioning & navigation system and
towing system are packed into a containerized
system.

Our Partner – SINOPEC GEOPHYSICAL CORPORATION

• 74-year’s experience in geophysical exploration all over the world
• Geophysical services including:
✓ Seismic Acquisition
✓ Processing & Interpretation
✓ Technology R&D
✓ Equipment Manufacturing
✓ Reservoir Services
✓ BeiDou PNT Application
✓ Surveying, Mapping & Geoinformation
✓ Engineering Geophysical Exploration
✓ Non-seismic Exploration
✓ Pipeline Detection
• Rich working experiences in mountain, desert, river-net, swamp,
jungle, TZ, shallow marine and deep marine conditions.

Our Partner – SINOPEC GEOPHYSICAL CORPORATION

Our Partner – Sinopec Offshore Oilfield Services Company

Seismic exploration in Marine, SW and TZ by SCOOSC
More than 40 years experience in shallow water & transition zone
(SW&TZ) seismic exploration, under various complex surface
conditions such as tidal flats, intertidal zones, shallow seas, lakes
and rivers. Has provided SW & TZ seismic services for many
international clients including PTTEP, Eni, ONGC, PPL, ROC Oil,
Oando, GREEN ENERGY, BAPEX all over the world.
Faxian 6 is a large 12-streamer vessel; 12x8km or 10x10km

No.

Equipment

Name

Unit

1

OBN

GPR300

6,100

2

Ethernet hub

10GB

5

3

Ethernet hub

1GB

3

4

Data processing system

DCM

2

5

NAS 96T

NAS 96T

4

If you have any questions or inquiries about Huatong Service Indonesia our services, please choose from the following options to find the best way to contact us:

How to Find Us

Fill up the Form and Ask Your Queries

Address

PT. Huatong Service Indonesia Talavera Office Park 28th Floor Jl. TB Simatupang No.Kav. 22 - 26 Cilandak Barat Kec. Cilandak Jakarta Selatan 12430

Phone

021-50323702

Whatsapp

081977739999

Email

info@huatongservices.co.id
hello@huatongservices.co.id

Book Your Appointment